soviet-slip-up-solutions

Phase 2: Re-Rerun

After the catastrophic failure of Phase 1, the Soviet Union's top engineers have regrouped to tackle the issue of Solutions.

With a new approach, they've created an array of Countermeasures to prevent future mishaps.

Phase 2 Re-Rerun: The New Plan

Theoretical Background

Phase 2's objective is to re-engineer the slip-up-prone system, taking into account the Thermal Expansion Prevention Technique, Structural Reinforcement Method, and Automatic Recovery System.

By combining these countermeasures, we aim to achieve a 99.9% slip-up reduction rate, surpassing our Phase 1 goal by 0.1%.

Experimental Results

Phase 2 Re-Rerun Results Confidence Interval
99.9% 0.1% ± 0.05%
Back to Phase 1 | Countermeasures